Somewhere in India right now, a WhatsApp forward is explaining that foreign companies are building giant buildings full of chips, and that this is why the lights keep going out. Navin's 83-year-old mother is worried. This week on AI Vey, we put her question to someone who has spent two decades inside India's power sector: how worried should she be?
Our guest, Dr. Vasundhara Sen, is an energy economist. She forecast electricity demand for GE Energy, worked on tariffs and wind at Suzlon, taught energy economics at SCMHRD, and researched how Indian households understand their electricity bills and whether they would pay more for green power. She now works full time in energy regulation and policy, and keeps three public trackers: India Datacenter Watch, India Energy Regulation Watch and India Green Hydrogen Watch.
Her short answer: not very. What holds data centers back is not the power itself but the corridor: the transmission lines and substations that carry it, which take years to build. Along the way she remembers coming home from school on Delhi summer afternoons to a doorbell that would not ring, explains why ethanol cannot run a data center, and puts her own work at 20% AI and 80% her.
Highlights
India's AI Demand — Against an all-India demand of about 260–270 GW, the data-center load forecasters expect by 2030 is a few gigawatts, and they have already built it into their published projections.
The grid cannot say no, only "not yet" — Under the regulations, a consumer or generator asking for grid access cannot be refused. Planners decide only when: ask for 1 GW by 2028 and you may get 200 MW a year.
It's the corridor — Ashish's analogy is India's highways: plenty of cars and plenty of buyers, not enough road. In the power sector the word is corridor, and the time it takes to build one sets when a data center can open.
Why big data centers go to the central grid — State grids run to 400 or 765 kV. The central grid now goes up to 1150 kV, and is more reliable. A 50–100 MW load can sit on a state grid; gigawatt campuses go central.
Where they are being built — Andhra Pradesh, Gujarat, Maharashtra, and Delhi, where some of today's load already sits. Eleven states now have policies aimed at attracting them.
Bring your own power — but what power? — US data centers build gas turbines on site. India does not have the gas, coal on site is unattractive, and a 1 GW solar plant in the Rajasthan desert runs into issues with land acquisition and solar panel availability. Plugging into the grid is easier.
Nuclear is early days — India's licensed reactor design is 700 MW. Private players would need 50–200 MW designs, the Bharat Small Reactors and small modular reactors now under discussion, plus final regulations and secure fuel.
The one demand number she trusts — Any consumer wanting more than 50 MW from the central grid has to file an application on the central planners' portal, and those filings are public. That is her benchmark; everything else is just an announcement. The state grids have no equivalent record.
Why the 2003 Electricity Act matters — She remembers the Delhi school-day power cuts under DESU, which generated, transmitted and distributed everything itself. The Act unbundled generation from the wires, and private generation followed. Today her doorbell always rings.
Imports: not fuel, but the wires — India is cutting its fuel import dependence, and is reducing its reliance on imported solar modules. Building transmission still depends heavily on imported material, mostly from Europe rather than China.
No armchair experts — Her advice to someone starting out is to avoid being an armchair expert. Get out on the ground and see what land and approvals can do to a project. Meanwhile her own regulatory work is going back to handwritten submissions, stamped papers and signed undertakings.
Notable quotes
Navin's follow-up for his mother: won't corrupt officials, and big companies happy to pay bribes, simply bypass the rules?
Vasundhara: No, it is policy. You can tell your mother that the power suppliers have something called a universal service obligation … We live in Pune, we are served by the distribution company. They are by law mandated to give you power if you are a customer. And it is their headache where they get the power from. So corruption is, of course, I am not denying there is, but … MSEDCL is by law obligated to serve to existing customers. And if they don't, then there are obligations and penalties on them.
Navin: Would you agree with this: Sure, the big companies can give money, but electricity is a thing that affects so many people and every one of them is a voter that governments will not neglect at least this aspect of the voters.
Vasundhara: Yeah, you can't because this is a necessity in law, in the books of law, electricity is right to life. It is defined as right to life. So if you are tampering with it, there are so many legal provisions to go back to that you would tread carefully before changing any existing setup.
On junior employees vs AI:
I'm going to say the teaching to a junior person is more stressful than teaching an AI today. … If I was to make a management report for the top leaders to read, is it 50% AI, 50% me? Is it 30% AI, 70% me? Or is it 100% me? I put my work at 20% AI, 80% me. Because a lot of the data does not make sense if you're not interpreting it correctly. So I would use the data collation from AI, but implications to business, strategies, actions to be taken is to me still a human mind application.
Links & resources
India Datacenter Watch, India Energy Regulation Watch and India Green Hydrogen Watch — Vasundhara's three public trackers, each tied to public documents.
S&P Global: how Indian states are reshaping the data center landscape — the report she points to on state data-center policies. Its Data Center Policy Attractiveness index scores 19 policies across 11 states.
PM-DHARA — the central scheme for state transmission she mentions near the end of the grid discussion. The Cabinet cleared it on 30 September 2026 with an outlay of ₹1.86 lakh crore, which she gives on air as ₹183,000 crore.
The Electricity Act, 2003 — the law that separated power generation from transmission and distribution.